Why are data centers loud? Do they need air conditioning in winter? Ten common questions about cooling, answered in plain English.
Building a data center involves land, power, permits, construction and testing. A step-by-step look at the typical journey from idea to operating facility.
Every watt a server uses becomes heat. Here is how air and liquid cooling each carry that heat away, and why AI hardware is pushing the...
Power availability now shapes where data centers can be built. Here is a practical list of questions professionals use to understand a site's electrical story, in...
Electricity entering a data center passes through switchgear, transformers, UPS systems and power distribution units before reaching a chip. Here is the path, step by step.
Popular claims about data centers and electricity range from overstated to simply wrong. Here are common myths alongside what grid basics actually tell us.
PUE is the most widely cited data center efficiency metric. Here is how it is calculated, what a good number looks like in general terms, and...
Training and running large AI models takes dense racks of specialized chips that draw far more power than traditional servers. Here is where all that electricity...
A plain-English walk along the path electricity takes, from the generator to the high-voltage lines to the substation and finally into a data center hall.
Investor relations for Boston Made, Inc.: company facts, our sister companies and the investor list.
Open InvestorsSix lanes that decide how fast AI gets built: power, cooling, chips, networks, sites and money.
Open ResearchResearch plans for operators, investors and suppliers. Monitor, Signal and Enterprise.
Open PlansBOSSTOX news, announcements and coverage — also on Reader with every Boston Made company.
Open PressThe Boston Made family of companies. One family, one membership — Boston Made+ opens all of them.
Open sister companies