Power & Grid
Demand Response: When Using Less Power Becomes a Grid Resource
Demand response pays customers to reduce electricity use when the grid is tight. Here is how programs work and why flexible AI workloads have entered the conversation.
The usual way to meet rising electricity demand is to build more supply. Demand response flips that around. Instead of adding a power plant, the grid asks some customers to use less electricity during the hours when supply is tightest. A megawatt not consumed at the peak can be as useful as a megawatt generated.
How programs work
Demand response takes many forms, but most programs share a basic structure. A customer agrees in advance to reduce consumption when called upon, usually during a limited number of events per year. In exchange, the customer receives payments, bill credits or a lower rate.
Common approaches include:
- Utility programs for homes, such as smart thermostat adjustments during heat waves.
- Large commercial and industrial programs where facilities curtail processes or switch to backup power.
- Wholesale market participation, where aggregated customer reductions bid into capacity or energy markets.
- Time-varying rates that encourage customers to shift use to cheaper hours without a formal event.
Companies known as aggregators often bundle many smaller customers together, managing their response so it looks like a single resource to the grid operator.
Why grid operators value it
Peak demand drives a lot of the grid’s cost. Generators, lines and transformers must be sized to handle the highest few hours of the year, even though those hours are rare. Shaving those peaks can reduce the need for infrastructure that sits idle most of the time.
Demand response can also be deployed quickly. During emergencies, it gives operators another tool before resorting to rotating outages.
The challenges
Demand response is not free of complications. Measuring a reduction requires estimating what the customer would have used otherwise, called a baseline, and baselines can be contested. Customers may be reluctant to participate if curtailment disrupts operations. And if the same customers are called repeatedly during a long event, their willingness or ability to respond may fade.
Rules for how demand response can participate in wholesale markets are set regionally and have evolved over time, so programs differ considerably from one region to another.
The new question: flexible AI loads
Data centers have traditionally been seen as poor candidates for demand response because they run critical services that cannot stop. But AI workloads are not all alike. A model training run may be able to pause, slow down or shift to another site for a few hours without harming anyone, while a live customer-facing service may not.
That has led researchers, utilities and operators to explore whether some computing loads can flex during grid stress. If a large campus could reliably reduce demand during the tightest hours, it might connect to the grid sooner or with fewer upgrades than a fully inflexible load. Approaches under discussion include scheduling workloads around grid conditions, using on-site batteries or generation during events, and contractual arrangements that allow the utility to curtail service in emergencies.
How widely this develops will depend on technology, contracts and regulation. It is one of the more interesting ideas in the effort to fit large new loads onto an already busy grid.
What a Demand Response Event Looks Like
Most participants experience demand response as a short, planned sequence. A typical commercial event might unfold as follows.
- Notice. The utility or aggregator sends an alert, often the day before or a few hours ahead, stating the event window.
- Preparation. Facility staff review which loads they will reduce. Some pre-cool buildings or finish energy-intensive tasks early.
- Curtailment. During the window, the facility dims lighting, raises thermostat setpoints slightly, pauses non-essential equipment or shifts to on-site generation where permitted.
- Measurement. Meters record actual use, which is compared with the baseline estimate.
- Settlement. Payments or credits are calculated based on the measured reduction, according to the program’s rules.
For homes, the experience is often simpler: a smart thermostat adjusts by a degree or two for a few hours, and the household can usually override it if needed.
A Checklist for Businesses Considering a Program
Before enrolling, organizations typically work through questions like these:
- Which loads can we actually reduce? Identify equipment that can pause or slow without harming safety, product quality or customers.
- How much notice do we need? Some programs give a day’s warning; others require response in minutes.
- How many events per year are expected, and how long might each last?
- What are the penalties for failing to deliver the promised reduction?
- How is the baseline calculated, and does it fairly reflect our normal operations?
- Are there rules on backup generators? Air permits often limit when and how long generators can run for non-emergency purposes.
- Who manages it? Decide whether to work directly with the utility or through an aggregator.
Program terms and financial results vary by region and utility, so this list is a starting point for discussion with qualified energy advisors rather than a recommendation.
Common Mistakes
Overcommitting
Promising a larger reduction than the facility can reliably deliver can lead to penalties and frustration. Starting conservatively is usually wiser.
Forgetting the rebound
After an event ends, equipment often restarts at once, creating a new spike. Staggering restarts helps avoid both grid strain and a higher demand charge.
Treating it as a one-time setup
Operations change. A process that could pause easily last year may be critical this year, so plans should be reviewed periodically.
Questions Readers Ask
Is demand response the same as a blackout? No. Demand response is voluntary and planned, with participants choosing in advance to reduce use. Rotating outages are a last-resort emergency measure.
Do homes really make a difference? Individually, a single home’s reduction is small. Aggregated across many thousands of homes, it can add up to a meaningful resource during peak hours.
How would a data center prove it flexed? The same way other participants do: through metering, baselines and agreed rules about what counts as a reduction. For very large loads, those rules are still being worked out in many regions.
What is the difference between demand response and energy efficiency? Efficiency lowers consumption all the time, for example through better lighting or insulation. Demand response targets specific hours when the grid is stressed. Both reduce the need for new supply, but in different ways, and many organizations pursue both.
Can time-of-use rates replace formal programs? They work alongside them. Rates encourage everyday shifting, while event-based programs give operators a dependable resource they can call on during the rare hours of greatest strain.
Latest stories
View allPower & Grid
A Maintenance Window Changes the Meaning of Redundancy
A facility’s normal arrangement is only one of its operating states. When equipment is removed from service for maintenance, the remaining paths may carry a different risk. A redundancy label needs to be read with that temporary configuration.
A facility's normal arrangement is only one of its operating states. When equipment is removed from service for maintenance, the remaining paths may carry a different risk. A redundancy label needs to be read with that temporary configuration.
The operating distinction
Maintenance can remove a spare component, change a transfer path or increase the load on equipment that remains available. The operational question is which further interruption the system could tolerate in that state. That question may have a different answer from the one given for normal operation.
Temporary states deserve names that operators can recognize. If a system has several possible maintenance configurations, a generic instruction to use the backup can leave too much unstated. The arrangement being discussed should match the equipment actually removed from service.
A practical example
Imagine a hypothetical system with alternate power paths while both are available. During planned work on one path, the other becomes more important. A second task on a related component could create an exposure that neither maintenance activity would create alone.
Questions worth asking
The temporary configuration changes the relevant failure question. Describing the available paths during maintenance helps readers understand both why the work is necessary and which additional conditions the operating team must manage around it.
- What protection remains while the selected equipment is unavailable?
- Could another planned activity affect the same remaining support path?
- What condition would postpone the work or require restoration of the normal arrangement?
What the evidence supports
This does not mean that maintenance should be avoided. Deferred work can increase other risks. It means that timing, dependencies and contingency arrangements belong in the planning discussion. Only qualified personnel following the site's procedures should operate or isolate electrical equipment.
The communication record should also identify when the temporary condition begins and how normal status is restored. Otherwise the next shift may inherit a narrower margin without realizing it. In a public explanation, this can remain high-level: the purpose is to distinguish resilience under normal conditions from resilience during planned work, not to publish sensitive switching instructions or suggest that every maintenance activity creates the same risk.
Describe resilience during the actual maintenance state, rather than borrowing the normal-state label without qualification.
Quick check
How much did you catch? Tap a question to see the answer.
1. Why read a redundancy label alongside maintenance plans?
Answer: Taking equipment out of service changes the risk on the paths that remain.
2. What question matters during maintenance?
Answer: Which further interruption the system could tolerate in that temporary state.
3. Why is “use the backup” too vague?
Answer: It doesn’t say which configuration matches the equipment actually removed from service.
Thinking in Operating States
A helpful habit is to describe a system as a set of named operating states rather than a single design. Each state has its own available paths and its own answer to the question of which further failure it could tolerate. In general terms, a facility might move through states such as these:
- Normal. All designed paths and spare components are available.
- Planned maintenance. A specific component or path is intentionally out of service for work.
- Degraded after a fault. A component has failed unexpectedly and the system is running on the remaining paths.
- Testing. The system is deliberately placed in a configuration to confirm that a function works.
- Restoration. Work is complete and the system is returning to normal, but checks are not yet finished.
Describing which state applies, and what remains available in it, gives operators and readers a shared language. It also makes clear that the same facility can have different resilience at different times of the same week.
Planning a Maintenance Window Step by Step
The following outline describes how a planning discussion can be structured. It is not a switching procedure, which belongs to qualified personnel and site-specific methods.
- Name the affected equipment and resulting state. State clearly what will be out of service and what the remaining arrangement will be.
- Identify what remains protected. Describe which further faults the remaining paths could tolerate.
- Check for overlapping work. Review other planned activities, supplier visits and tests that could affect the same remaining path.
- Consider external conditions. Weather forecasts, utility notices and unusual load periods may favor a different timing.
- Set stop conditions. Agree in advance which developments would pause the work or trigger a return to the normal arrangement.
- Communicate the window. Inform affected teams and customers as appropriate, including start, expected end and restoration checks.
- Confirm restoration. Verify that normal status has returned and record it so the next shift knows.
Common mistakes
Two unrelated teams scheduling work on components that share a dependency is a classic problem, especially when change records are kept in separate systems. Another mistake is leaving a temporary state in place longer than planned without updating the shift record. A third is treating the restoration as complete as soon as equipment is energized, before checks confirm that the redundant path is genuinely available again.
What This Means for Customers and Readers
For a business hosted in a facility, maintenance notices are an opportunity to understand how resilience changes during planned work. A provider that explains the temporary state, the remaining protection and the stop conditions is communicating useful information. For readers following the industry, a redundancy label describes design intent; operating practice determines how well that intent holds up across the year.
Redundancy is a property of a particular moment, not a permanent label on the building.
Questions Readers Ask
Why not simply avoid maintenance to keep redundancy intact?
Deferred maintenance can increase the chance of unplanned failures. Planned work is usually the safer path when it is scheduled and coordinated carefully.
Can a facility remain fully redundant during maintenance?
Some designs are built to keep a spare path available while one path is under maintenance. Whether that applies depends on the specific design and the work involved.
Should customers be told about maintenance windows?
Many agreements include notification arrangements. The details vary by provider and contract.
What is a stop condition?
A pre-agreed event or reading that pauses the work or triggers restoration of the normal arrangement.
AI infrastructure explainers and news on iPhone, iPad and Apple Watch.
Power & Grid
Draw the Outage Boundary Before Comparing Backup Power
A backup-power claim becomes easier to understand when its boundary is drawn on a simple diagram. Keeping a server powered is different from keeping an entire service available, and neither statement describes every possible interruption.
A backup-power claim becomes easier to understand when its boundary is drawn on a simple diagram. Keeping a server powered is different from keeping an entire service available, and neither statement describes every possible interruption.
The operating distinction
Electricity reaches the application through equipment with different jobs. A battery may support the server while a generator starts, yet the cooling controls, network equipment or building pumps could depend on another circuit. If any necessary part loses power, the application can stop even when its own power supply remains healthy.
The boundary also determines what an availability statement leaves out. A supplier may describe its equipment accurately while a customer reasonably hears a promise about the application. Those interpretations should be reconciled before a purchase or acceptance discussion.
A practical example
Consider a hypothetical hall with battery-backed racks and a cooling pump outside that protected boundary. A short interruption could leave the processors running while coolant circulation stops. The useful question is how the whole service behaves during that interval, rather than whether the rack has a battery.
Questions worth asking
An availability promise becomes clearer when the protected equipment and the promised user outcome are named together. Otherwise different parties can agree on the words while assuming different boundaries around the service.
- Which supporting systems sit outside the protected power boundary?
- What happens while the system transfers between power sources?
- Which test demonstrates the claimed application-level behavior?
What the evidence supports
A drawing is not proof of performance. Actual protection depends on the installed arrangement, controls, maintenance state and tests. Two facilities using the same redundancy label can have different dependencies and different opportunities for a shared failure.
One useful reading exercise is to trace an ordinary user request through the drawing and mark every system it needs. Then consider an interruption at each boundary. This is a discussion exercise, not permission to disconnect equipment. It helps reveal which claims depend on assumptions that have not yet been stated and which supporting systems need evidence of their own before the broader service claim can be understood.
Define the service first, then examine the electrical and mechanical chain that keeps that service running.
Quick check
How much did you catch? Tap a question to see the answer.
1. Is keeping a server powered the same as keeping a service available?
Answer: No. Cooling, networking and building systems can sit on other circuits.
2. What helps make a backup-power claim clear?
Answer: Drawing its boundary on a simple diagram.
3. What can happen if a cooling pump sits outside the protected boundary?
Answer: Processors keep running while coolant circulation stops.
Going Deeper: Drawing the Diagram Step by Step
The exercise described above works best with a plain sheet of paper and a simple method. Here is one way to build the drawing for a hypothetical service before any comparison of backup power begins.
- Name the service outcome. Write one sentence at the top describing what users must be able to do, for example “customers can submit and receive answers within the agreed response time.” Everything else on the page exists to support that sentence.
- List the systems the request touches. Servers, storage, network switches, firewalls, the cooling loop serving those racks, the controls that run the cooling, and any building systems such as pumps or ventilation that the room depends on.
- Mark each system’s power source. Note which ones sit on battery-backed circuits, which rely on generator support only, and which run on ordinary utility power.
- Draw the boundary. Circle everything protected by the backup arrangement under discussion. Anything outside the circle is a dependency the claim does not cover.
- Walk through the transfer. For each system, ask what happens in the seconds between a utility interruption and the backup source taking over, and again when power returns.
- Note the evidence. Beside each system, write what test, document or record shows how it behaves. Blank spaces become the questions to ask.
Why the transfer interval deserves its own line
Batteries and generators do different jobs on different timescales. The battery carries the load immediately; the generator needs time to start and stabilize. Equipment that rides through the first interval may still be affected if it loses support during the second, or if controls reset when the source changes. Writing the sequence down makes those moments visible instead of assumed.
Common Gaps the Diagram Tends to Reveal
- Cooling controls on a separate circuit. Chillers or pumps may be backed up, but the controllers that tell them what to do might not be.
- Network equipment outside the protected room. A switch or router in another closet can become the single point that takes the service offline.
- Shared upstream components. Two “redundant” paths that pass through one panel, one transfer switch or one fuel supply can fail together.
- Monitoring that depends on the thing it monitors. If alarms run through systems that lose power, operators may not learn of a problem until users do.
- Restart behavior. Some equipment does not return to normal operation automatically when power is restored and may need manual steps.
Questions to Bring to a Supplier or Facility Conversation
- Which of the systems on our drawing does your claim cover, and which does it exclude?
- Is the stated availability measured at the equipment, the room or the service?
- What recent tests exercised the full transfer sequence, and what did they show?
- How are maintenance periods handled, when part of the protection may be out of service?
- Who is responsible for dependencies that sit between your scope and ours?
Questions Readers Ask
Is a redundancy label enough to compare two facilities? As noted above, the same label can describe different arrangements. The drawing and the evidence behind it are what make a comparison meaningful.
Who should draw the diagram? Ideally the people responsible for the service and the people responsible for the facility, together, so that assumptions on both sides end up on the same page.
Does this apply to small server rooms too? Yes. A single rack with a battery unit in an office can still depend on an unprotected air conditioner or network closet, so the same drawing exercise is useful at any scale.
How often should it be updated? Whenever equipment, layout or the service itself changes. A drawing that no longer matches the installed arrangement can be more misleading than none at all.
AI infrastructure explainers and news on iPhone, iPad and Apple Watch.
Power & Grid
FERC’s Large-Load Orders: The November 16 Grid Deadline Behind the AI Build-Out
FERC told all six grid operators it regulates to justify or rewrite their rules for connecting data centers and other large loads. After extensions, the answers are due November 16. Here is what to watch.
For most of the AI build-out, the hard question about a new data center has been about hardware: can the operator get the accelerators, the transformers and the cooling equipment? A slower question sits underneath all of them. Who decides how a 300-megawatt customer connects to the transmission grid, how long the study takes, and who pays if the project never arrives?
On June 18, 2026, the Federal Energy Regulatory Commission put that question to every grid operator it regulates. It issued six show cause orders, one each to PJM, MISO, SPP, CAISO, ISO New England and NYISO. Each order tells the operator and its transmission owners to either prove their current rules for large loads are just and reasonable or file new ones. After extensions, the responses are now due on November 16, 2026, for five of the six regions and November 20 for SPP.
This article explains what FERC asked for, where each step stands, and what the filings will tell readers following AI infrastructure.
How the grid got here
Generators that connect to the transmission grid have long had a federal process: a queue, studies and a standard agreement. Large consumers of electricity mostly did not. A new factory or data center usually connected through its local utility under rules set largely by states. That arrangement worked when a large industrial customer meant tens of megawatts. It strains when single campuses ask for hundreds of megawatts, sometimes with their own generation on site.
In October 2025 the Secretary of Energy used his authority under the Department of Energy Organization Act to send FERC an advance notice of proposed rulemaking on large-load interconnection, opened as Docket No. RM26-4-000. FERC says its staff reviewed more than 3,500 pages of public comments. Rather than issue a single national rule, the Commission chose tailored orders under Section 206 of the Federal Power Act, region by region. The rulemaking docket remains open.
FERC staff’s explainer describes the orders as covering facilities with maximum demand of at least 20 megawatts. They build on two earlier actions: a December 2025 order directing PJM to adopt transparent tariff rules for load co-located with generation, and FERC’s approval of SPP’s High Impact Large Load process.
The five issues every region must answer
Each order is tailored to its region, but all six identify the same five areas for reform:
- Faster, clearer study processes. A defined application path for large loads with accelerated study timelines, including evaluation of grid-enhancing and alternative transmission technologies.
- No cost shifting. Rules that keep upgrade costs for new large loads from landing on other customers, and public transparency into what those upgrades cost.
- Co-location and behind-the-meter generation. Clear tariff rules for data centers built next to, or behind the meter of, a power plant.
- Services for flexible loads. New transmission products, such as non-firm or contract-demand service, for customers willing to curtail during grid stress.
- Studying generation and load together. A process to study new generation alongside the nearby or co-located load it is built to serve.
The second item may matter most for public acceptance. FERC preliminarily found that operators do not publicly post enough data on the upgrades and costs needed to serve new large loads. The remedies it floated include posting each upgrade’s scope, cost and cost assignment, plus a central cost-transparency page on each operator’s website. FERC also asked whether operators should adopt standard cost recovery agreements among the grid operator, the transmission owner and the large customer. Those agreements would protect other ratepayers if a project is canceled or leaves early.
Two limits are easy to miss. The findings are preliminary, and FERC staff note the orders do not impose new transmission rates. The orders also apply going forward. FERC said they are not meant to disturb existing agreements or negotiations already near completion.
Where the clock stands
The orders set two deadlines. Within 30 days, each region had to file an informational report on how it will keep enough generation for existing and new large loads. MISO, for example, filed its report on July 20. Within 60 days, each region had to file its tariff response, unless it asked FERC to pause the case.
The operators asked for that pause, and FERC staff now list November 16 as the response date for five regions and November 20 for SPP. CAISO’s August 3 motion requested a 90-day abeyance so it could build a tailored filing with its transmission owners through an accelerated stakeholder process. MISO and its transmission owners filed a similar request the same day, and MISO reports that FERC granted it on August 14. In MISO’s case, responses are now due November 16 and answers to those responses December 16.
The pause has limits. CAISO’s motion notes that FERC said it would not grant abeyances reflexively. FERC capped them at 90 days and said it would look with great disfavor on requests to extend them further. That makes November 16 a firmer date than regulatory deadlines often are.
Some regional work is moving on a parallel track. CAISO’s published schedule takes its large-load proposal to its Board of Governors on October 28, ahead of the FERC filing. MISO separately filed interconnection reliability requirements for large loads on August 28, asking for a December 4 effective date.
What the filings will reveal
The responses will be long and technical. A handful of questions will say most of what matters about how quickly new AI capacity can connect, and on what terms.
- Study timelines. Does each region commit to a defined number of days for a large-load study, and what readiness deposits or milestones must a project show to keep its place?
- Interim service. Can a data center take non-firm or as-available service while network upgrades are built, and how often could that service be curtailed?
- Financial security. How much must a large customer commit up front, and what happens to that money if the project shrinks or is canceled?
- Co-location rules. How will regions treat a campus that sits beside a power plant, and what share of grid costs does it carry?
- Cost posting. Will upgrade costs be published per project, so state regulators and the public can see who pays?
The answers will likely differ by region. A region that offers a fast, well-defined path with clear collateral rules may attract projects that can meet those terms. A region whose answers stay open-ended may keep seeing projects wait in queues and bilateral negotiations. Readers should treat any claimed speed-up with care until the tariff language is approved and the first projects move through it.
The orders also leave a gap. Utilities outside the six RTO and ISO regions, including much of the Southeast and West, are not directly covered. FERC Chairman Laura Swett encouraged those transmission providers to pursue similar reforms through their own filings. ERCOT, which runs most of the Texas grid, is not subject to the orders.
Why this belongs on an AI-infrastructure watch list
BOSSTOX has covered the physical limits on AI capacity: transformer lead times, transmission and local grid upgrades, behind-the-meter generation and on-site storage. The FERC proceeding is the rulebook that ties those pieces together. It decides how a project enters the grid, which upgrades it triggers, and who carries the risk if forecast demand does not arrive.
The dates to watch are concrete: CAISO’s board meeting on October 28, the six responses due November 16 and 20, answers due in mid-December, and the FERC orders that follow. BOSSTOX will review the filings once they are posted and report what each region actually committed to.
This article is general information about a regulatory proceeding. It is not investment, legal or regulatory advice. Filing dates come from FERC and grid-operator documents and may change; check the dockets for the latest.
Sources
- FERC, “FERC Launches Aggressive Targeted Action to Speed Large Load Integration,” June 18, 2026: ferc.gov
- FERC Office of Public Participation, “Cost Transparency and Customer Protection Initiatives in FERC’s June 2026 Show Cause Orders for Large Load Interconnections”: ferc.gov
- California ISO, “Motion for Abeyance,” Docket No. EL26-71-000, August 3, 2026: caiso.com
- MISO, “Large Load Working Group FERC Status Report,” September 9, 2026: misoenergy.org
- Akin Gump, “FERC Issues Landmark Show Cause Orders on Large Load Interconnection,” June 2026: akingump.com
BOSSTOX Research articles are drafted with AI assistance and reviewed by our editors before publication. See our editorial standards.
-
Power & Grid1 month agoTransformer Lead Times Are Becoming a Data-Center Schedule Risk
-
Power & Grid1 month agoGas Turbines on Data-Center Campuses
-
Cooling2 months agoWater Use and Dry Coolers: The Tradeoff AI Sites Cannot Avoid
-
Power & Grid1 month agoFERC’s Large-Load Orders: The November 16 Grid Deadline Behind the AI Build-Out
-
Compute & Silicon2 months agoGPU Supply Chains: How AI Hardware Gets Made, Moved, and Bottlenecked
-
Power & Grid1 month agoBattery Storage at AI Sites
-
Capital & Backlog1 month agoAI Infrastructure’s Rough Week: Chips Fall 6.7% as Meta Lifts Capex Floor
-
Cooling1 month agoLiquid-Cooling Leak Detection and Reliability
