Follow the power, cooling, chips, networks, sites and capital behind the AI buildout. Start with an explainer or explore the latest research.
Dry coolers reject heat to the air without evaporating water. Here is how they work and why liquid cooling has made them more attractive.
Data center cooling has swung from water to air and back toward liquid. A brief history of how the industry got here.
Data center designs use shorthand like N+1 and 2N to describe backup capacity. Here is what the terms mean and how they apply to cooling.
Why are data centers loud? Do they need air conditioning in winter? Ten common questions about cooling, answered in plain English.
Bringing liquid close to servers raises an obvious question: what happens if it leaks? Here is how operators design, detect and respond.
Even the most advanced liquid-cooled AI racks still shed some heat into the air. Here is how hybrid designs split the work between the two.
Data halls used to be kept cold enough for a sweater. Industry guidance now allows much warmer conditions. Here is why that change matters.
Data center water use is often discussed but frequently misunderstood. Here we sort common myths from the facts behind them.
Evaporative and adiabatic cooling use water to make cooling far more energy efficient. Here is how they work and why the tradeoff depends on location.
Immersion cooling depends on liquids that carry heat but not electricity. A look at the main fluid families and the properties engineers weigh.
Six lanes that decide how fast AI gets built: power, cooling, chips, networks, sites and money.
Open ResearchResearch plans for operators, investors and suppliers. Monitor, Signal and Enterprise.
Open PlansBOSSTOX news, announcements and coverage — also on Reader with every Boston Made company.
Open PressThe Boston Made family of companies. One family, one membership — Boston Made+ opens all of them.
Open sister companiesOn Facebook
The latest posts from our Facebook Page, updated automatically.






Latest from BOSSTOX
CoolingCoolant Compatibility Belongs in the Spare-Parts Conversation
Power & GridTransformer Loading Is More Than a Nameplate Comparison
Capacity & SitesStormwater Planning Starts Before the Data Hall Opens
NewsWho Pays for AI’s Electricity? The Data Center Fight Reaches the Senate
NetworkingFiber Repair Slack Is Part of the Restoration Plan
Compute & SiliconFirst Response and Full Completion Are Different Inference Questions