Follow the power, cooling, chips, networks, sites and capital behind the AI buildout. Start with an explainer or explore the latest research.
Tier I through Tier IV ratings describe how a data center's infrastructure is designed to handle maintenance and failures. Here is what the levels mean in...
For decades, data centers were built on raised floors. Many new facilities sit on concrete slab instead. Here is why the shift happened.
Containment keeps hot exhaust and cool supply air from mixing. Here is how hot aisle and cold aisle approaches differ and what each asks of a...
PUE is the most widely cited data center efficiency metric. Here is what it measures, what a good score means and where the number can mislead.
WUE compares a data center's water use with the energy used by its IT equipment. Here is how it is calculated and why context matters when...
Cooling towers reject heat by evaporating water. Here is the simple physics behind them, the equipment involved and the tradeoffs operators weigh.
Chillers produce the cold water many data centers rely on. A plain-English look at how they work, the main types and why operators try to run...
A rear-door heat exchanger replaces the back door of a rack with a liquid-cooled coil. It is one of the simplest ways to bring liquid cooling...
Two-phase immersion uses fluids that boil at low temperatures right on the surface of hot chips. A look at the physics, the appeal and the open...
In single-phase immersion cooling, servers sit in tanks of non-conductive liquid that never boils. Here is how it works and where it fits.
Six lanes that decide how fast AI gets built: power, cooling, chips, networks, sites and money.
Open ResearchResearch plans for operators, investors and suppliers. Monitor, Signal and Enterprise.
Open PlansBOSSTOX news, announcements and coverage — also on Reader with every Boston Made company.
Open PressThe Boston Made family of companies. One family, one membership — Boston Made+ opens all of them.
Open sister companiesOn Facebook
The latest posts from our Facebook Page, updated automatically.






Latest from BOSSTOX
CoolingCoolant Compatibility Belongs in the Spare-Parts Conversation
Power & GridTransformer Loading Is More Than a Nameplate Comparison
Capacity & SitesStormwater Planning Starts Before the Data Hall Opens
NewsWho Pays for AI’s Electricity? The Data Center Fight Reaches the Senate
NetworkingFiber Repair Slack Is Part of the Restoration Plan
Compute & SiliconFirst Response and Full Completion Are Different Inference Questions